How long does it typically take to build a standard-size concrete pool? (not including excavation) | | 2-3 weeks | 37% | | 3-4 weeks | 12% | | 5-6 weeks | 25% | | 6-7 weeks | 25% | | | | | Question: How long does it typically take to build a standard-size concrete pool? (not including excavation) Top Answer (37% of 8 votes): 2-3 weeks.
Answer: 2-3 weeks Explanation: Its the average build time to complete the job with amount of work to complete and weather permitting. | | BAT Concrete llc | Answer: 5-6 weeks Explanation: This is of course weather dependent. Generally speaking, if your contractor is able to be on the job daily, they should have no problem completing your project within a 5 to 6 week time-frame. | | Water Scuppers and Bowls, LLC | Answer: 3-4 weeks Explanation: Depending on the size, layout and inspection scheduling (barring any unforeseen delays or interruptions) new concrete/gunite pool construction should take 3-4 weeks. | | NorCal Pool Builders |
|