How long does it typically take to build a standard-size concrete pool? (not including excavation)

2-3 weeks
28%
3-4 weeks
14%
5-6 weeks
28%
6-7 weeks
28%
Get Free Quotes Today!
Question: How long does it typically take to build a standard-size concrete pool? (not including excavation)
Top Answer (28% of 7 votes): 2-3 weeks.

Answer: 2-3 weeks
Explanation: Its the average build time to complete the job with amount of work to complete and weather permitting.
BAT Concrete llc
Answer: 5-6 weeks
Explanation: This is of course weather dependent. Generally speaking, if your contractor is able to be on the job daily, they should have no problem completing your project within a 5 to 6 week time-frame.
Water Scuppers and Bowls, LLC
Answer: 3-4 weeks
Explanation: Depending on the size, layout and inspection scheduling (barring any unforeseen delays or interruptions) new concrete/gunite pool construction should take 3-4 weeks.
NorCal Pool Builders
Get Free Quotes Today!
Find Local Pros
Free Concrete Pool Installation Cost Estimates

Related Questions

How Much Does Pool Replastering Cost?

How Much Does Pool Resurfacing Cost?

How Much Does Pool Heater Installation Cost?

How Much Does a Gas Pool Heater Cost?

How Long Does a Pool Heat Pump Typically Last?Top answer: Five to ten years



Free Cost Estimates   |   Pool Builders Directory   |   Pools Cost Report   |   Free Business Listing



All users of ProMatcher.com are subject to our terms of use.

Home   |   Articles & Videos   |   Affiliates   |   Networking Groups   |   Search by Category

Terms of Use   |   Privacy   |   Partner Network   |   Your Privacy Choices   |   About Us   |   Contact Us   |   Member Login

©2003-2024 - VentureStreet, LLC

Join Our Business Network